baronmarine
Charter Member
I'm knot ready!!! Need to assemble top end of one Sterling. Need to tear down and have heads done on second Sterling. Exhaust work too. Put in dry pipe fittings at the outlets. Weld off muffler ring outlets, add down pipes into water.
The Saber will make it by June if knot before. But the fountain may get wet in early May.
Hey Todd, we may have to put on some winter jackets and get out there asap! I'm jonesin' for the water. Been working on boats all winter. It was easier when I couldn't see them all winter.
dan i can't wait. sheri just paid the insurance today. we are heading out to the cottage after work. if your in gh over the weekend give me a ring.
btw its good to see you don't have much work left. ww rules!
todd